Module 06 · Sewing

Bulk cannot start before the PP meeting passes.

Line loading, hourly output and WIP by operator — visible on the floor in Bangla. The PP gate is hard: no bulk sewing is recorded against a style whose pre-production meeting has not been signed off.

Line chiefs · supervisors · operators
SEWING / LINE 4
Live
Hourly output · 36,000 pcs
eff 71%
Hour
Target
Actual
09:00
210
198
10:00
210
214
11:00
210
221
12:00
210
186
Hour 4 dropped — machine down 11 minutes.
Log downtime
Three capabilities

What it stops doing by hand.

01
Hourly output on the line’s own screen
Target against actual every hour, in Bangla, sized for the board on the wall — and on the owner’s phone at the same moment.
02
WIP per operator
Bundles scanned in and out per operation, so the bottleneck is a name and a machine, not a feeling.
03
Downtime with a reason
Machine down, no input, needle change — logged against the line that lost the hour and the mechanic who fixed it.
The MARBIM moment

MARBIM drafts the shift summary in plain Bangla for the line chief.

Read from hourly output · downtime log. Nothing is saved until the line supervisor presses approve — and the stamp says who, when, and what they saw.

MARBIM proposes. Your people approve.
Hover or tap the card to approve it.
Draft · not savedSEWING
Hourly output · 36,000 pcs
09:00
210
10:00
210
11:00
210
sources: hourly output · downtime log
Approve
the line supervisor
21:44
CHECK-03
PP gate
Bulk output is refused until QA signs the pre-production meeting for this style.
Blocks: bulk sewing